Building permit — Addition / Alteration · BP-2022-01938
Field Review - Addition / Alteration - #203 - 2nd floor Interior alterations to this existing dwelling unit on the 2nd floor (#203) in this existing multiple dwelling building. Scope of work: kitchen and bathroom reno. Raising drop ceiling in kitchen, new flooring, cabinets, fixtures, LED pot lights, LED lighting to cabinets. Electrical, plumbing, & sprinklers to suit. OK for Field Review per K. Vogt E2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.