Building permit — Addition / Alteration · BP-2021-03865
Field Review - Addition / Alteration - #1708 To alter the interior of this existing suite on the 17th floor (suite #1708) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required as per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.