Building permit — Addition / Alteration · BP-2021-04103
Field Review - Addition / Alteration - #201 - 1371 Harwood Interior Alterations to existing dwelling unit to provide improvements and layout changes. Scope of work to include: Update Handles & doorstops, baseboards, install closet shelving & rods, closet doors, Install new flooring, Correct firestopping as required, Remove and relocate Kitchen wall, Install cabinets, countertops, ceramic flooring, microwave, dishwasher, sinks. Re/re sink, toilet tub in bathroom. notes: ~ Schedule B - Fire Separation signed by John J. McCuaig 604.255.0992 ~ E2 Upgrade required: Installing Energy Guide/Energy Star Dishwasher ~ Building Not Sprinklered – No sprinkler permit required. ~ DBI to determine on site if removal of wall(s) requires Structural Engineer (Schedule B Structural) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.