Building permit — Addition / Alteration · BP-2022-01011
Field Review - Addition / Alteration - #12 - 12th floor and loft Interior alterations only to provide improvements in this existing full floor dwelling unit on the 12th floor and upper floor loft (unit#12) of this existing multiple dwelling building on this site. Scope of work: demo and construction of partition walls to enlarge closet in master bedroom, back framing ceiling to be flushed with ceiling throughout, replace bathtub with shower, relocate laundry machines, reconfigure kitchen, remove 2 f/p, replace 1 f/p, replace plumbing fixtures, new millwork, new flooring throughout. Electrical, Plumbing, & sprinklers to suit. OK for Field Review per K. Vogt E2 - SWH - Install low flor shower heads in all showers. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.