Building permit — Addition / Alteration · BP-2021-03392
Field Review - Addition / Alteration - Interior alterations to provide improvements to this existing unit (702) in this existing multiple dwelling building on this site. Scope of work: remove existing fixtures. Relocate and install new fixtures. Finishing throughout. Plumbing and Electrical to suit. E2 level upgrade required. E2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. OK for filed review as per Rosa Astorino July 2, 2021.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.