Building permit — Addition / Alteration · BP-2021-04525
Field Review - Addition / Alteration - #401 - Interior alterations to this existing unit #401 in this existing multiple dwelling building. Scope of work to include: Relocate interior walls, full reno to kitchen and bathrooms. Updates to flooring, tile, millwork, paint and all fixtures throughout. Electrical and Plumbing to suit. OK for field review as per Rosa Astorino - Aug 23, 2021 Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler Permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.