Building permit — New Building · DB-2022-01777
High Density Housing / Commercial - New Building - To install 8 CSA approved premanufactured shipping containers for a new spa (D) tenant. 6 units will be spa units, one unit is a reception unit and 1 unit is for mechanical equipment. To be treated as a single part 3 building connected by an exterior passageway. To be sprinklered to NFPA 13. All work done on site to be inspected by the City of Vancouver Inspections group. Ok for DB as per Mandy So. To be reviewed under the 2019 VBBL. Revision #1 1. Exterior Cladding and Awnings - Remove exterior cladding and awnings from containers 2. Wall Assemblies - Revise wall assemblies as shown on A1.5 3. Spa Dropped Ceiling - Revise ceiling assembly C2 as shown on A1.5 to eliminate combustible concealed space and associated sprinkler requirements 4. Debris Skirting and Decking Gaps - Add debris skirting and revise decking gaps and fence extents to satisfy sprinkler requirements. See A1.3 5. Clearance width adjacent to tubs – Revise clearance width in spa area. See A2.3. 6. to change the mech/plbg eng to J Gravanis effective Feb.13/23 Accepted March 14/23 Revision #2 - To change the engineer for the fence/foundation details and to provide updated fence details and layout. - Accepted June 7/23 Revision #3 - to remove the exit sign @ G/L 2 between Spa [002] and Washroom Changeroom [001]. - accepted Aug.25/23 Revision #4 - ??? 1 - Remove Exit sign @ G/L 1 2 - Add pull stations at exit doors in fence.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.