Building permit — Addition / Alteration · BP-2021-03761
Field Review - Addition / Alteration - #317 Interior alterations to provide improvements to dwelling unit (townhouse) #317 on the 3rd and 4th level of this existing multiple dwelling building on this site. OK for Field Review per W.Wong, July 16, 2021 No sprinkler permit required per DBI. Scope: - install a new electric fire place at SE corner instead of the existing fire place - Add new kitchen island with sink & dish washer and remove peninsula - Core 5.5" hole under new kitchen Island for electrical and plumbing access; Engineering report by: Liang Engineering Ltd & GPR scanning by West Coast Scanning - seal doorway between bedroom & bathroom in the Master bedroom - Seal foyer closet doorway - Convert second bedroom and foyer closets into open space in the second bedroom Note: - Energy Upgrade: E2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.