Building permit — Addition / Alteration · BP-2021-04387
Field Review - Addition / Alteration - 4th Floor - Unit #407 Interior alterations to unit #407 to modify the kitchen layout, upgrade the finishes, appliances, and fixtures throughout the suite in this existing multi-dwelling building on this site. Letter of assurance provided by: John J. McCuaig, 604-255-0992, Schedule B (Architectural, Plumbing, Electrical) Scope of work: - Fix fire stopping in walls where applicable - Kitchen wall modification to create open concept - New kitchen appliances, cabinet, flooring - Bathroom renovation Note: - DBI to determine on site whether Structural drawings and schedule B are required - E2-Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher). Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.\t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.