Building permit — Addition / Alteration · DB-2021-04715
Field Review - Addition / Alteration - Interior alterations to provide improvements for the office and production area in this existing manufacturing factory warehouse. Letters of assurance submitted: -Sch B (Struc): Leo T. Torrente, P.Eng., 604.434.6295 Revision #3 -Add two overhead doors at the east facade. -Add an interior ramp at southeast corner of building. -Add a room at second floor. -Add racking to the warehouse. Revision #2 -Remove walls at warehouse area Room 102 Printing -Add a wall and a door at second floor Room 214 Mechanical -Change door location at second floor Room 214 -Reinstall a sink at ground floor Room 107 Printing. Revision #1 -Remove existing Die Room at the ground floor -Add a new Die Room at the second floor -Add walls at warehouse area – this space is labeled as printing on the ground floor in the drawings. Provided 29 parking spots. Sprinkler Permit required per DBI. Energy upgrade E2 - Lighting - Exterior Lighting Control (per 9.4.1.4 of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.