Building permit — Addition / Alteration — 1202 KINGSWAY, Vancouver, BC V5V 3E1
Source: Vancouver — Issued permits — 2023-2025
High Density Housing / Commercial - Addition / Alteration - Change of Major Occupancy - To combine 1210 Kingsway (existing billiard hall, Group A2) and 1202 Kingsway (existing restaurant, Group A2) and to change the use and major…
Building permit — Addition / Alteration · DB-2023-00117
High Density Housing / Commercial - Addition / Alteration - Change of Major Occupancy - To combine 1210 Kingsway (existing billiard hall, Group A2) and 1202 Kingsway (existing restaurant, Group A2) and to change the use and major occupancy to a Vehicle Dealer (Group E) with ancillary repair shop (Group F2). Building Review Branch Notes: - Change of Major Occupancy exceeding 5-year limit, upgrade levels F4, S4, N4, A4 are required. *** Reviewed under the VBBL 2019 *** Revision #1, Dec 20, 2023 - J. Chen - Change front door size and configuration - Change washroom layout - Change HVAC location - Add offices Revision #2, Dec 21, 2023 - J. Chen - Change Structural Engineer. Structural Drawings and schedule B have been replaced.
Application address
1202 KINGSWAY, Vancouver, BC V5V 3E1
Source-reported status
Issued
Source record created
Issued date
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.
About this project
Permit value (CAD): 104000.00
Type of work: Addition / Alteration
Property use: Service Uses
Specific use: Motor Vehicle Repair Shop
Area: Kensington-Cedar Cottage
Permit issued: 2023-05-25
Permit number created: 2023-01-10
HueFlux feedback
Recorded project feedback. These responses do not establish property condition or represent the whole community.
Essential cookies keep FolioProjects working. With your permission, Mouseflow records visits to selected public marketing pages. Recording is disabled when you are signed in and on private pages.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.