Building permit — Addition / Alteration · BP-2022-05309
Field Review - Addition / Alteration - #600 - 6th Floor (full floor tenant) Interior alterations to combine #605 and #650 into a full floor office space (#600) and to provide tenant improvements for the existing office tenant in this existing commercial building on this site. Scope of work: Remove the demising wall to combine the 2 units, remove/construct partition walls, doors, frames, millwork, universal washroom upgrade, electrical, plumbing and sprinkler work. REVISION #1: To revise the scope of work to full demolition (to shell) retaining ONLY the washroom and corridor walls & increase in occupant load. Separate permit is required for future tenant improvement or to change the use. -Jan 30/25 - LLL Letters of Assurance submitted by:: Schedule A and Architectural Schedule B, Rufina Wu, Architect, AIBC., 604.484.1593 Electrical Schedule B, Henry Boornberg, P.Eng., 403.313.8270 Plumbing/Mechanical Schedule B, Daniel Prescott, P.Eng. 604.255.1169 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: 1 @ E2\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.