Building permit — Addition / Alteration · BP-2021-01927
Field Review - Addition / Alteration - #517 - 5th floor Interior alterations to provide improvements to this existing office tenant on the 5th floor (#517) of this existing commercial building on this site. Scope of Work: remove and construct to relocate interior walls and doors. Plumbing, electrical and sprinkler to suit. REVISION #1: change the glazing wall of the kitchen and storage to a metal stud partition, the sink and cabinet to remain at its original location and the door to the kitchen and storage is no longer required as this has become an opening. Aug 8, 2022 mlh Structural Schedule B submitted by Shi, Li Qing, P.Eng., ph: 778-772-7508 Sprinkler permit required per DBI. Energy Upgrade: To select upgrade to E2 and to update on plan Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.