Building permit — New Building · BP-2024-02604
High Density Housing / Commercial - New Building - Multiplex: To construct a 5-Unit multiple dwelling building with 4 surface parking stalls accessed from the rear lane. BRB notes: 1. Sprinklered to NFPA 13R 2. Part 5 design Revison #1 - Sept 17, 2026 (Issued) 1.\tChange of registered architect (same AIBC architect, different firm) 2.\tWall assembly typo correction – revise six (6) layers of 5/8" Type X gypsum board to five (5) layers. 3.\tAdd windows #11-1, #11-2, #26-1 and #26-2. 4.\tRevise window size at #14 and orientation at #1 and #5. 5.\tReplace windows #29-1 and #29-2 with sliding doors. 6.\tRemove PMT and replace with fifth parking stall; add EV charging curb. 7.\tRelocate garbage bin area. 8.\tRevise roof material from metal shingles to asphalt shingles. 9.\tRelocate AC pads: o\tUnits 1 & 4 – under front stairs. o\tUnits 2 & 3 – second-floor front decks. o\tUnit 5 – second-floor patio. 10.\tRevise "AC" callouts to "HEAT PUMP UNIT." 11.\t1st Floor – Replace closets with millwork; revise mechanical room to shared building mechanical room. 12.\tUnits 1 & 4 – Delete den; revise washer/dryer closet to 36" x 34" and mechanical room to 48" x 78". 13.\tUnits 2 & 3 – Relocate entry closets to back of toilet wall; revise to 24" x 48". 14.\tUnits 2 & 3 – Revise powder room to 48" x 80" and rotate adaptable space hatching (48" x 30") for City compliance. 15.\tUnit 5 – Swap mechanical room and powder room locations. 16.\t3rd Floor – Replace closets with millwork. 17.\tUnit 2 – Swap washer/dryer and indoor heat pump unit locations. 18.\tUnit 5 – Enlarge master bedroom walk-in closet to 8'-0" x 48".
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.