Building permit — Addition / Alteration · BP-2022-03610
Field Review - Addition / Alteration - CF-2022-004724 Interior alterations to provide improvements to this existing restaurant on the 1st floor of this commercial building on this site. Scope of work includes new ceiling panels, wall finishes, millwork for bar area, trenching for new plumbing lines to bar area and new washroom fixtures. New tenant: Archer Dining OK for field review as per Dave Holbrook, DBI on July 15 , 2022. Notes: - Schedule B, Architectural, Mohammed Saeed Jhatam, 778-688-1966. - Energy Upgrade: E2 - Lighting - Upgrade to incorporate automatic partial off (per 9.4.1.1.(g) of ASHRAE 90.1-2016) - This building is sprinklered. A separate sprinkler permit is required for proposed sprinkler work. - No translucent or opaque film, artwork, posters, shelving, display cases or similar elements are to be installed on or directly outside or inside of the approved glazing frontages and windows. A separate sign permit is required. Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.