Building permit — Addition / Alteration · DB-2023-02601
Field Review - Addition / Alteration - Exterior and interior alteration, and change of major occupancy from restaurant to retail store of this existing commercial high-rise building on this site. Scope of work: new display windows, walls, doors, stairs, ramps, and electrical and plumbing work. Tenant: The Swatch Group Ok for Field Review as per DBI - D.Holbrook. Separate permit required for sign. Letter of assurance provided by: Schedule A & B (Architectural): Renato A.L. Balbi, (403) 253-2853 Schedule B (Mechanical & Electrical): Mark Peric, P. Eng, (416) 848-0639 Note: This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trade’s permits (e.g. electrical and plumbing). No translucent or opaque film, artwork, posters, shelving, display cases or similar elements are to be installed on or directly outside or inside of the approved glazing frontages and windows so that the interior of the premises is visible at all times from the sidewalk
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.