Building permit — Addition / Alteration — 1133 MELVILLE STREET, Vancouver, BC V6E 4E5

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Certified Professional Program - Addition / Alteration - Interior alterations to provide tenant improvements for a new office at 19th through 22nd floors and the elevator lobby at 23rd floor in this building currently under construction.

Listed on FolioProjects
2026-11-28
Location
1133 MELVILLE STREET, Vancouver, BC V6E 4E5
Application number
BP-2021-04912
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T22:30:21.514909+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 23:37:14.764903+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2021-04912

Certified Professional Program - Addition / Alteration - Interior alterations to provide tenant improvements for a new office at 19th through 22nd floors and the elevator lobby at 23rd floor in this building currently under construction. Interior scope of work from the 19th through 22nd floors includes tenant suite, elevator lobby, public corridor with exclusion of base building core areas and base building washrooms. The 19th floor also includes food prep area/ kitchen and the furniture at the outdoor terrace. The scope of work on the 23rd floor is partial and only includes the elevator lobby area. Note: The sprinkler system for Commercial kitchen (Class 2) at level 19 shall be designed under NFPA 13 to OHG1. As a security measure, it is proposed to install an electromagnetic locking hardware at the entry suite door of Levels 19, 21 and 22. The electromagnetic locks will be will be installed in accordance with Sentence 3.4.6.16. (4) of the VBBL. Sequence of operation letter by Paul Gogan, Architect AIBC along with a sketch showing the proposed location of the maglocks on file. Commitment by the owner to decommission the proposed maglocks once no longer required on file. 28-Oct-2022 -Revision 1 Food Premises Plan Review Memo and stamped plans by VCH (L19) added to file. 15-Dec-2022 - Revision#2 To remove proposed work in the elevator lobby at L23 from this Permit. To retain the Level 23 as a shell office space and a cross over floor, as approved under the base Building Permit BP-2018-02682.

Application address
1133 MELVILLE STREET, Vancouver, BC V6E 4E5
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

Showing a limited selection of address matches. Search the application address for more records.

About this project

Permit value (CAD): 11000000.00

Type of work: Addition / Alteration

Property use: Office Uses

Specific use: General Office

Area: Downtown

Permit issued: 2022-01-31

Permit number created: 2021-09-20

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.