Building permit — Addition / Alteration · BP-2021-05834
Field Review - Addition / Alteration - Unit 1202 and 1401 Exterior and interior alterations to repair fire damaged units in the existing multiple dwelling building on this site. Scope of work: exterior removal and replacement required materials. All finishing to match existing. Damaged windows to be replaced in 1401. Drywall repair in both units. DBI to determine if peng required OK for field review as per Rosa Astorino - November 10, 2021 Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.