Building permit — Addition / Alteration · BP-2021-00007
Certified Professional Program - Addition / Alteration - Interior alteration for this first tenant Improvement on the 1st Floor of this newly built manufacturing/office base building. Tenant fit out totals approx. 28,500 sf. 24,500 sf of which is the Motor Vehicle Repair Shop, and, 4,000 sf is support areas (office, lunch rooms, etc.) No spray booth proposed. NO DP REQUIRED AS PER JOHN GREER FEB-11-21 VBBL-2019 - NFPA 13 Stage 1 - Full Construction for First Tenant Improvement issued on April 22, 2022. Stg 1 - Revision #1 (Oct. 11, 2022) - Interior alteration changes on the following: A0.01, A1.00: Outline of Service Platform above future spray booth has been added. A0.01, A1.00: Removal of Electrical Room near gridlines E and 3A. (Equipment to remain as part of open floor area.) A0.01, A1.00, A2.00, A3.00: Revision to Interior Glazing for Parts and Reception Offices. (Above is to accomodate the removal of horizontal mullions for compatibility with window sprinklers under alternative solutions.) A0.01, A1.00: Added 10' high, 18'-4" long block wall at gridline G. (Ceiling height is ~19'-2".) A2.00, A5.01: Electromagnetic lock added to main reception area door in conformance with VBBL 2019 Div. B Sent. 3.4.6.16.(4) & (7). E-203: Electromagnetic lock added to main reception area door to release on fire alarm activation. E-601: Electromagnetic lock detail and control schematic provided in conformance with VBBL 2019 Div. B Sent. 3.4.6.16.(4) & (7).
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.