Building permit — New Building · BP-2021-05008
Certified Professional Program - New Building - Construction of the new St. Paul's Hospital, containing 4 below grade levels below: Parking, Loading Dock, Logistics Areas, Facility Management Offices, Morgue, Central Food Production and End-of-Trip facilities); and 11 above-grade levels: (Hospital Departments and series such as Emergency, Renal Health, Surgery, Mental Health, Maternity, Medical Imaging and Laboratory). Stage I: Construction Below Grade. Revision #1 to Stage I: To revise below grade stairs, corresponding vestibules, and architectural "slab layout plans" - issued July 5/22. Stage II: Levels 1-5 Structure and On Site Civil Work - issued November 7/22. Stage III: Interior fit-out for Levels P4 to Level 3 and Envelope work Levels 1 to 5 - issued February 21/23. Excluding the following: wood elements (exterior canopies and wood roof), combustible interior finishes (interior decorative wood wall finish, wood ceiling finish and wood floors), auditorium (fit out of auditorium and terracing of auditorium), sprinkler valve coordination with fire alarm system, magnetic door lock coordination with fire alarm system, and door hold open coordination with fire alarm system. Stage IV: Full construction (issued Aug/3/23) Revision #2: Change of Civil Engineer of Record: the new engineer is Cian Gallagher as of August 26/ 2022. Revision #3: Change of sprinkler engineer of record: Scott Rattray is a new EoR as of 03/04/202 Revision #4: To change the address Revision #5: Project-wide Revisions per Consultants’ Change Summary Letters, including the removal of the civic plaza development per DPMA DP-2024-01009; Change of Building Envelope Professional; Change of Civil Engineer (issued 07/15/2026)
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.