Building permit — Demolition / Deconstruction · DB-2024-03166
Enquiry Centre - Demolition / Deconstruction - To demolish to grade this Single Detached House (1948) and its accessory building on the site and as such 75% of the demolition material must be recycled. Demolition Contractor: All Right Trucking 99 Ltd - Sarbjit Nahal Tel: 604-710-8972 QP: Pacific Ark Environmental Consulting Ltd - Xiaoqiang Yang tel: 778-985-3688 Related to: DP-2023-00554: Response to Conditions BP-2024-02264: In Review Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [email protected]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or 604-873-7000 outside of Vancouver. 4) All work must be conducted in accordance with Safe Work Procedures approved by Qualified Professional and WorkSafeBC requirements. 5) Demo to grade only. No soil disturbance or excavation of soil other than that which is incidental to the demolition is permitted under this permit.
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.