Building permit — Addition / Alteration · BP-2022-05156
Field Review - Addition / Alteration - #2 - Ground Level CF-2022-011551 Interior alterations to provide tenant improvements to a new office tenant on the ground floor (#2) of this existing commercial building on site. Scope of work: New flooring, light and plumbing fixtures, paint, bathroom tile, electrical and plumbing work. TENANT: Bislaw Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy Upgrade: E2 - Hvac - Clean and Balance all AirSystems (per 6.7.2.3.2 of ASHRAE 90.1-2016) SWH1 - Upgrade SWH sytem Temperature Controls (per 7.4.4.1 of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.