Building permit — Addition / Alteration · BP-2022-02278
Field Review - Addition / Alteration - Exterior and interior alterations to install underground piping and to interconnect heating /building heating system with new district piping system tied to the existing heating plant at this School site (Langara College) OK for field review per Hilton Letters of authorization provided by: Stephen Kooiman, P,Eng, Schedule A, Hyungryul (David) Joo, P.Eng, Electrical Schedule B, David Woo, P.Eng, Structural Schedule B, Hamid Samani, P.Eng, Mechanical and Plumbing Schedule B. Note to applicant: A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.