Building permit — Addition / Alteration · BP-2021-03488
Field Review - Addition / Alteration - #304 Interior alterations to provide improvements to dwelling unit #304 on the 3rd floor of this multiple dwelling building on this site. Scope of work: - push back a kitchen & bathroom wall - Replace kitchen cabinets, appliances, and millwork - Replace toilet, vanity - Convert bathtub into a walk in shower OK for Field Review, W.Wong, July 8, 2021 Note: - DBI to determine on site whether Structural drawings and schedule B are required; Walls to be pushed back are not Structural based on applicant email that it is reviewed by an architects (attached in documents): 1.\tGage of the steel is too thin 2.\tStructure of the ceiling (floor of the loft) extended past to a beam 3.\tThe studs are not standard 12" apart and one doesn't even make it to the floor (picture attached) - Energy upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.\t\t\t\t\t\t\t\t\t\t\t
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.