Project · Public

Local Road Reconstruction — ST LEONARDS CRES From: ST LEONARDS AVE To: DAWLISH AVE, Toronto

Source: Toronto — Road reconstruction, resurfacing and sidewalks

Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs.

Listed on FolioProjects
2026-11-24
Location
BAYVIEW WOOD From: MILDENHALL RD To: [65.97 m N/E] ST AUBYNS CRES [END]; BRAESIDE CRES From: BRAESIDE RD To: [1 m E] BRAESIDE RD [CITY LIMITS]; BUCKINGHAM AVE From: ST IVES AVE To: [32.60 m] ST IVES…
Application number
1
Source-reported status
Active

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Toronto — Road reconstruction, resurfacing and sidewalks · Last checked 2026-11-24T21:05:19.345236+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Toronto. Adapted for FolioProjects; no municipal endorsement implied. Licence

Summary totals updated 2026-11-24 21:11:03.947826+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Local Road Reconstruction · 1

Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road. Construction timeline: Q1 2025 - Q4 2025 (Carry-Over). Start year: 2024. Contract number: EXTERNAL. Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road. Construction timeline: Q4 2027 - Q1 2030. Start year: 2027. Contract number: EXTERNAL. Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Construction timeline: 2027 - 2030. Start year: 2027. Contract number: EXTERNAL. Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Construction timeline: Q4 2027 - Q1 2030. Start year: 2027. Contract number: EXTERNAL.

Application address
BAYVIEW WOOD From: MILDENHALL RD To: [65.97 m N/E] ST AUBYNS CRES [END]; BRAESIDE CRES From: BRAESIDE RD To: [1 m E] BRAESIDE RD [CITY LIMITS]; BUCKINGHAM AVE From: ST IVES AVE To: [32.60 m] ST IVES AVE [CITY LIMITS]; BUCKINGHAM AVE From: WANLESS CRES To: MILDENHALL RD; CHELTENHAM AVE From: ST IVES AVE To: [20.30 m E] ST IVES AVE [CITY LIMITS]; CHELTENHAM AVE From: ST IVES CRES To: MILDENHALL RD; DAWLISH AVE From: DANESWOOD RD To: BAYVIEW AVE; DAWLISH AVE From: FIDELIA AVE To: DANESWOOD RD; LEWES CRES From: ST LEONARDS AVE To: ST LEONARDS AVE; MILDENHALL RD From: BLYTHWOOD RD To: LAWRENCE AVE E; MILDENHALL RD From: LAWRENCE AVE E To: ROTHMERE DR; PEMBURY AVE From: ST LEONARDS AVE To: LAWRENCE BAYVIEW S [RAMP]; PROCTOR CRES From: ROTHMERE DR To: MILDENHALL RD; ROCHESTER AVE From: MILDENHALL RD To: LEWES CRES; ROCHESTER AVE From: ST IVES CRES To: LEWES CRES; ROTHMERE DR From: BRAESIDE RD To: MILDENHALL RD; SEVENTH ST From: LAKE SHORE (W) DR To: MORRISON ST (ETBK); ST LEONARDS AVE From: LEWES CRES To: BAYVIEW AVE; ST LEONARDS AVE From: [155 m W] MILDENHALL RD To: LEWES CRES; ST LEONARDS CRES From: ST LEONARDS AVE To: DAWLISH AVE; WOOD AVE From: LAWRENCE BAYVIEW S [RAMP] To: ST AUBYNS CRES
Source-reported status
Active

Other addresses listed in this application: BAYVIEW WOOD From: MILDENHALL RD To: [65.97 m N/E] ST AUBYNS CRES [END]; BRAESIDE CRES From: BRAESIDE RD To: [1 m E] BRAESIDE RD [CITY LIMITS]; BUCKINGHAM AVE From: ST IVES AVE To: [32.60 m] ST IVES AVE [CITY LIMITS]; BUCKINGHAM AVE From: WANLESS CRES To: MILDENHALL RD; CHELTENHAM AVE From: ST IVES AVE To: [20.30 m E] ST IVES AVE [CITY LIMITS]; CHELTENHAM AVE From: ST IVES CRES To: MILDENHALL RD; DAWLISH AVE From: DANESWOOD RD To: BAYVIEW AVE; DAWLISH AVE From: FIDELIA AVE To: DANESWOOD RD; LEWES CRES From: ST LEONARDS AVE To: ST LEONARDS AVE; MILDENHALL RD From: BLYTHWOOD RD To: LAWRENCE AVE E; MILDENHALL RD From: LAWRENCE AVE E To: ROTHMERE DR; PEMBURY AVE From: ST LEONARDS AVE To: LAWRENCE BAYVIEW S [RAMP]; PROCTOR CRES From: ROTHMERE DR To: MILDENHALL RD; ROCHESTER AVE From: MILDENHALL RD To: LEWES CRES; ROCHESTER AVE From: ST IVES CRES To: LEWES CRES; ROTHMERE DR From: BRAESIDE RD To: MILDENHALL RD; SEVENTH ST From: LAKE SHORE (W) DR To: MORRISON ST (ETBK); ST LEONARDS AVE From: LEWES CRES To: BAYVIEW AVE; ST LEONARDS AVE From: [155 m W] MILDENHALL RD To: LEWES CRES; ST LEONARDS CRES From: ST LEONARDS AVE To: DAWLISH AVE; WOOD AVE From: LAWRENCE BAYVIEW S [RAMP] To: ST AUBYNS CRES.

Source: Toronto — Road reconstruction, resurfacing and sidewalks. Source: Toronto open municipal data. Adapted for FolioProjects; no municipal endorsement implied.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Source segments: 21

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.