Building Additions/Alterations — 825 DON MILLS RD, Toronto
Source: Toronto — Building permits — 2026 onward — part A
Proposal for the installation of a temporary fire-rated dust-tight hoarding within the ECLRT tunnel to separate the public from the Ontario Line construction area.Egress requirements, life safety systems, pedestrian circulation and ECLRT…
Proposal for the installation of a temporary fire-rated dust-tight hoarding within the ECLRT tunnel to separate the public from the Ontario Line construction area.Egress requirements, life safety systems, pedestrian circulation and ECLRT facilities operation will not be impacted. Pedestrian modeling and fire life safety documentation is provided as part of the permit application package. Revision: 00. Structure: Transit Station,Subway, Bus Terminal. Work: Other(BA). Current use: Transit Station. Proposed use: Transit Station. Dwelling units created: 0. Dwelling units lost: 0. Declared construction value (CAD): 50,000.00.
Application address
825 DON MILLS RD
Source-reported status
Under Review
Application submitted
Source: Toronto — Building permits — 2026 onward — part A. Source: Toronto open municipal data. Adapted for FolioProjects; no municipal endorsement implied.
These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.
These applications share an address listed by the municipality. They remain separate records; this does not confirm that they are phases of one development.
About this project
Revision: 00
Structure: Transit Station,Subway, Bus Terminal
Work: Other(BA)
Current use: Transit Station
Proposed use: Transit Station
Dwelling units created: 0
Dwelling units lost: 0
Declared construction value (CAD): 50,000.00
HueFlux feedback
Recorded project feedback. These responses do not establish property condition or represent the whole community.
Essential cookies keep FolioProjects working. With your permission, Mouseflow records visits to selected public marketing pages. Recording is disabled when you are signed in and on private pages.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.