Building Additions/Alterations — 365 BLOOR ST E, Toronto

Source: Toronto — Building permits — 2026 onward — part B

Proposed cooling tower and miscellaneous garage repairs.

Listed on FolioProjects
2026-11-22
Location
365 BLOOR ST E
Application number
26 113799 BLD
Source-reported status
Inspection
Application date
2026-02-05

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Toronto — Building permits — 2026 onward — part B · Last checked 2026-11-22T21:45:18.670703+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Toronto. Adapted for FolioProjects; no municipal endorsement implied. Licence

Summary totals updated 2026-11-22 22:01:15.706216+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building Additions/Alterations · 26 113799 BLD

Proposed cooling tower and miscellaneous garage repairs. Work includes cooling tower beam and column repairs; loading dock ramp trench drain repairs including frame and grate replacement and general waterproofing. Garage drain installation and re-waterproofing at P1 accessibility door, garage vent shaft concrete and waterproofing repairs; and P1 Bell room targeted concrete repairs. Miscellaneous work under this contract includes the following items: Bike room leakage investigation assisstance; block wall repointing near the P3 residential elevators; injection waterproofing at the foundation wall and elevator pit soffit. Revision: 00. Structure: Office. Work: Other(BA). Current use: Office/Commercial. Proposed use: Office/Commercial. Dwelling units created: 0. Dwelling units lost: 0. Declared construction value (CAD): 27,650.00.

Application address
365 BLOOR ST E
Source-reported status
Inspection
Application submitted
Issued date

Source: Toronto — Building permits — 2026 onward — part B. Source: Toronto open municipal data. Adapted for FolioProjects; no municipal endorsement implied.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Revision: 00

Structure: Office

Work: Other(BA)

Current use: Office/Commercial

Proposed use: Office/Commercial

Dwelling units created: 0

Dwelling units lost: 0

Declared construction value (CAD): 27,650.00

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.