Commercial / Multi / Industrial · BP128440
Phase 1, Building C - Subaru Service Support and parking structure. New construction of 2018 BCBC 2 Storey, Part 3 Bldg, 3.2.2.79 (Group F2) repair garage and 3.2.2.86 (Group F3) parking garage. Building area 1625.29m2. Combustible or non-combustible construction, Sprinklered to NFPA13 with Fire Alarm System. 45min FRR/FS or 0hr FRR/FS non-combustible construction required for floor assemblies and supporting structures. Minimum 2hr FRR/FS between repair garage and all other occupancies. Minimum 1.5hr FRR/FS between storage garage and all other occupancies. Total GFA is 3208.34m2. Exposing Bldg face requirements; 1hr FRR for NE and SE (Repair garage F2), 45min FRR for SE (Car wash F3), and 1hr FRR for SW (E-Car Storage F3). 2025-SEP-11 REVISION: Cladding changes, stair 1 layout, accessible shower, carwash overhead door, mechanical ventilation changes.
Other addresses listed in this application: 4900 ISLAND HIGHWAY N.
Source: City of Nanaimo — Planning, building, demolition and subdivision records.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.