Commercial / Multi-Res Alteration — 411 Dunsmuir Street, Nanaimo

Source: City of Nanaimo — Planning, building, demolition and subdivision records

(CITY SARC BLDG) - Work includes new interior partition walls for new meeting rooms and to realign offices on each floor. Mechanical adjustments to suit new layout. Sprinkler work includes relocating 2 heads and adding 2 heads on the 2nd floor. Adding 2 heads and relocating 4 heads on the third floor. Building Description, Part 3, Governing article, 3.2.2.54, Office building, Group D, Three storeys with Parking Garage, Group F3 on ~ half of the 1st storey. Building sprinklered with fire alarm. First storey, Group D = 792 m2 plus Group F3 = 788 m2; Second Storey, Group D, 1542 m2; Third Storey = 1672 m2 . Gross Floor area (Group D) = 4006 m2 plus Parking Garage (Group F3) = 788 m2. Floor assemblies and load bearing non-combustible construction as per 3.2.2.54; Exits = 45 min. FRR/FS; 1.5 hr FRR/FS between F3 and Group D. 45 metre TD. Elevator and machine room 45 min FRR/FS; Janitor room FS, Occupant load = 430 persons,

Listed on FolioProjects
2026-11-13
Location
411 Dunsmuir Street
Application number
BP127149
Source-reported status
COMPLETED
Application date
2021-02-02

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Municipal application details

Commercial / Multi-Res Alteration · BP127149

(CITY SARC BLDG) - Work includes new interior partition walls for new meeting rooms and to realign offices on each floor. Mechanical adjustments to suit new layout. Sprinkler work includes relocating 2 heads and adding 2 heads on the 2nd floor. Adding 2 heads and relocating 4 heads on the third floor. Building Description, Part 3, Governing article, 3.2.2.54, Office building, Group D, Three storeys with Parking Garage, Group F3 on ~ half of the 1st storey. Building sprinklered with fire alarm. First storey, Group D = 792 m2 plus Group F3 = 788 m2; Second Storey, Group D, 1542 m2; Third Storey = 1672 m2 . Gross Floor area (Group D) = 4006 m2 plus Parking Garage (Group F3) = 788 m2. Floor assemblies and load bearing non-combustible construction as per 3.2.2.54; Exits = 45 min. FRR/FS; 1.5 hr FRR/FS between F3 and Group D. 45 metre TD. Elevator and machine room 45 min FRR/FS; Janitor room FS, Occupant load = 430 persons,

Application address
411 Dunsmuir Street
Source-reported status
COMPLETED
Application submitted
Issued date
Source final date
Source expiry date

Source: City of Nanaimo — Planning, building, demolition and subdivision records.

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

Applications sharing a municipal address

These applications share an address listed by the municipality. They remain separate records; this does not confirm that they are phases of one development.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

About this project

Commercial / Multi-Res Alteration · BP127149
(CITY SARC BLDG) - Work includes new interior partition walls for new meeting rooms and to realign offices on each floor. Mechanical adjustments to suit new layout. Sprinkler work includes relocating 2 heads and adding 2 heads on the 2nd floor. Adding 2 heads and relocating 4 heads on the third floor. Building Description, Part 3, Governing article, 3.2.2.54, Office building, Group D, Three storeys with Parking Garage, Group F3 on ~ half of the 1st storey. Building sprinklered with fire alarm. First storey, Group D = 792 m2 plus Group F3 = 788 m2; Second Storey, Group D, 1542 m2; Third Storey = 1672 m2 . Gross Floor area (Group D) = 4006 m2 plus Parking Garage (Group F3) = 788 m2. Floor assemblies and load bearing non-combustible construction as per 3.2.2.54; Exits = 45 min. FRR/FS; 1.5 hr FRR/FS between F3 and Group D. 45 metre TD. Elevator and machine room 45 min FRR/FS; Janitor room FS, Occupant load = 430 persons,
Source-reported status: COMPLETED. Application status does not establish construction activity or completion.
Application date: 2021-02-02.
Permit issue date: 2021-03-16.
Source final date: 2021-12-22.
Source expiry date: 2023-03-16.
Addresses listed by the municipality: 411 DUNSMUIR STREET. These are source-listed associations, not a verified parcel history.
Municipal application source
City of Nanaimo, What's Building public application CSV. The City is the data source, not necessarily the project owner. This profile is not managed or endorsed by the City.
Source data licence and terms of use

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

Feedback totals are unavailable.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.