Commercial / Multi-Res Alteration — 505 Eighth Street (Salvation Army Church), Nanaimo

Source: City of Nanaimo — Planning, building, demolition and subdivision records

Interior renovations consisting of upgrading HVAC system and removal of sink, replace sliding wall panels in coffee room, create door opening in corridor wall for door into office 4. Structural Eng for new openings in masonry block walls Existing Building: BCBC 1980 Group A2, 3.2.2.14 Building area 827m2, combustible with fire alarm system. 45min roof assembly structure. 2024-AUG-26 REVISION: See internal notes.

Listed on FolioProjects
2026-11-13
Location
505 Eighth Street (Salvation Army Church)
Application number
BP129578
Source-reported status
COMPLETED
Application date
2023-09-26

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Municipal application details

Commercial / Multi-Res Alteration · BP129578

Interior renovations consisting of upgrading HVAC system and removal of sink, replace sliding wall panels in coffee room, create door opening in corridor wall for door into office 4. Structural Eng for new openings in masonry block walls Existing Building: BCBC 1980 Group A2, 3.2.2.14 Building area 827m2, combustible with fire alarm system. 45min roof assembly structure. 2024-AUG-26 REVISION: See internal notes.

Application address
505 Eighth Street (Salvation Army Church)
Source-reported status
COMPLETED
Application submitted
Issued date
Source final date
Source expiry date

Source: City of Nanaimo — Planning, building, demolition and subdivision records.

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

About this project

Commercial / Multi-Res Alteration · BP129578
Interior renovations consisting of upgrading HVAC system and removal of sink, replace sliding wall panels in coffee room, create door opening in corridor wall for door into office 4. Structural Eng for new openings in masonry block walls Existing Building: BCBC 1980 Group A2, 3.2.2.14 Building area 827m2, combustible with fire alarm system. 45min roof assembly structure. 2024-AUG-26 REVISION: See internal notes.
Source-reported status: COMPLETED. Application status does not establish construction activity or completion.
Application date: 2023-09-26.
Permit issue date: 2024-01-25.
Source final date: 2024-11-12.
Source expiry date: 2026-01-25.
Municipal application source
City of Nanaimo, What's Building public application CSV. The City is the data source, not necessarily the project owner. This profile is not managed or endorsed by the City.
Source data licence and terms of use

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

Feedback totals are unavailable.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.