Commercial / Multi-Res Alteration — 505 Eighth Street, Nanaimo

Source: City of Nanaimo — Planning, building, demolition and subdivision records

(The Salvation Army CFS Nanaimo) Commercial alternation and horizontal addition to this existing 1-storey building. Scope of work includes: Building enclosure upgrades to existing exterior walls, roof, windows and select exterior doors. Commercial kitchen renovation for type 1 cooking operations, structural, plumbing, mechanical and electrical upgrades, alternations to existing fire alarm system and horizontal addition (188.42m2) at east building face. New plumbing fixtures include: new universal washroom, washer, mop-sink, commercial dishwasher, sink, hand-sink, drinking fountain and HWT. 45 min FRR roof assembly required. Existing Building: BCBC 1980 Group A2, 3.2.2.14 Building area 827m2, combustible with fire alarm system. non-sprinklered, 45min roof assembly structure.

Listed on FolioProjects
2026-11-13
Location
505 Eighth Street
Application number
BP131638
Source-reported status
ACTIVE
Application date
2026-04-08

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Municipal application details

Commercial / Multi-Res Alteration · BP131638

(The Salvation Army CFS Nanaimo) Commercial alternation and horizontal addition to this existing 1-storey building. Scope of work includes: Building enclosure upgrades to existing exterior walls, roof, windows and select exterior doors. Commercial kitchen renovation for type 1 cooking operations, structural, plumbing, mechanical and electrical upgrades, alternations to existing fire alarm system and horizontal addition (188.42m2) at east building face. New plumbing fixtures include: new universal washroom, washer, mop-sink, commercial dishwasher, sink, hand-sink, drinking fountain and HWT. 45 min FRR roof assembly required. Existing Building: BCBC 1980 Group A2, 3.2.2.14 Building area 827m2, combustible with fire alarm system. non-sprinklered, 45min roof assembly structure.

Application address
505 Eighth Street
Source-reported status
ACTIVE
Application submitted
Issued date
Source expiry date

Source: City of Nanaimo — Planning, building, demolition and subdivision records.

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

Applications sharing a municipal address

These applications share an address listed by the municipality. They remain separate records; this does not confirm that they are phases of one development.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

About this project

Commercial / Multi-Res Alteration · BP131638
(The Salvation Army CFS Nanaimo) Commercial alternation and horizontal addition to this existing 1-storey building. Scope of work includes: Building enclosure upgrades to existing exterior walls, roof, windows and select exterior doors. Commercial kitchen renovation for type 1 cooking operations, structural, plumbing, mechanical and electrical upgrades, alternations to existing fire alarm system and horizontal addition (188.42m2) at east building face. New plumbing fixtures include: new universal washroom, washer, mop-sink, commercial dishwasher, sink, hand-sink, drinking fountain and HWT. 45 min FRR roof assembly required. Existing Building: BCBC 1980 Group A2, 3.2.2.14 Building area 827m2, combustible with fire alarm system. non-sprinklered, 45min roof assembly structure.
Source-reported status: ACTIVE. Application status does not establish construction activity or completion.
Application date: 2026-04-08.
Permit issue date: 2026-05-28.
Source expiry date: 2028-05-29.
Addresses listed by the municipality: 505 EIGHTH STREET. These are source-listed associations, not a verified parcel history.
Municipal application source
City of Nanaimo, What's Building public application CSV. The City is the data source, not necessarily the project owner. This profile is not managed or endorsed by the City.
Source data licence and terms of use

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

Feedback totals are unavailable.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.