Project · Public

Leasehold Improvements — 105-238 Franklyn Street (RJC), Nanaimo

Source: City of Nanaimo — Planning, building, demolition and subdivision records

Complete shell,Tenant improvement Group D (RJC Egineering), 202.4 m2. work includes constructing 48.2 m2 mezzanine, adding plumbing fixtures, partition walls, changes to sprinkler system Existing 5-storey, 46 unit mixed use building with 3 CRU shells.Building classification (superimposed occupancies) 3.2.2.24 Group A2, 3.2.2.50, Group C, up to 6 storeys,sprinklered. 3.2.2.56 Group D, up to 6 storeys, sprinklered. 3.2.2.62 Group E, Any height, any area, sprinklered. 3.2.2.80, Group F3, up to 6 storeys, sprinklered. Fire alarm system. Storage garage separated by 2hr FS/FRR from adjacent occupancies. Floors(E to C), elevator shafts and exit stairs at 1st and 2nd storey 2hr FS/FRR. Floors, elevator shafts and exit stairs floors 3-5 have 1hr FS/FRR. Separation between adjacent residential suites and corridors 1hr FS/FRR. Mezzanine floor 1hr FRR. Alternative solution includes combustible timber frame beams within a non-combustible construction area 2023-JAN-24 REVISION: HVAC changes

Listed on FolioProjects
2026-11-13
Location
105-238 Franklyn Street (RJC)
Application number
BP128707
Source-reported status
COMPLETED
Application date
2022-08-23

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Municipal application details

Leasehold Improvements · BP128707

Complete shell,Tenant improvement Group D (RJC Egineering), 202.4 m2. work includes constructing 48.2 m2 mezzanine, adding plumbing fixtures, partition walls, changes to sprinkler system Existing 5-storey, 46 unit mixed use building with 3 CRU shells.Building classification (superimposed occupancies) 3.2.2.24 Group A2, 3.2.2.50, Group C, up to 6 storeys,sprinklered. 3.2.2.56 Group D, up to 6 storeys, sprinklered. 3.2.2.62 Group E, Any height, any area, sprinklered. 3.2.2.80, Group F3, up to 6 storeys, sprinklered. Fire alarm system. Storage garage separated by 2hr FS/FRR from adjacent occupancies. Floors(E to C), elevator shafts and exit stairs at 1st and 2nd storey 2hr FS/FRR. Floors, elevator shafts and exit stairs floors 3-5 have 1hr FS/FRR. Separation between adjacent residential suites and corridors 1hr FS/FRR. Mezzanine floor 1hr FRR. Alternative solution includes combustible timber frame beams within a non-combustible construction area 2023-JAN-24 REVISION: HVAC changes

Application address
105-238 Franklyn Street (RJC)
Source-reported status
COMPLETED
Application submitted
Issued date
Source final date
Source expiry date

Other addresses listed in this application: 238 FRANKLYN STREET.

Source: City of Nanaimo — Planning, building, demolition and subdivision records.

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

Applications sharing a municipal address

These applications share an address listed by the municipality. They remain separate records; this does not confirm that they are phases of one development.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

About this project

Leasehold Improvements · BP128707
Complete shell,Tenant improvement Group D (RJC Egineering), 202.4 m2. work includes constructing 48.2 m2 mezzanine, adding plumbing fixtures, partition walls, changes to sprinkler system Existing 5-storey, 46 unit mixed use building with 3 CRU shells.Building classification (superimposed occupancies) 3.2.2.24 Group A2, 3.2.2.50, Group C, up to 6 storeys,sprinklered. 3.2.2.56 Group D, up to 6 storeys, sprinklered. 3.2.2.62 Group E, Any height, any area, sprinklered. 3.2.2.80, Group F3, up to 6 storeys, sprinklered. Fire alarm system. Storage garage separated by 2hr FS/FRR from adjacent occupancies. Floors(E to C), elevator shafts and exit stairs at 1st and 2nd storey 2hr FS/FRR. Floors, elevator shafts and exit stairs floors 3-5 have 1hr FS/FRR. Separation between adjacent residential suites and corridors 1hr FS/FRR. Mezzanine floor 1hr FRR. Alternative solution includes combustible timber frame beams within a non-combustible construction area 2023-JAN-24 REVISION: HVAC changes
Source-reported status: COMPLETED. Application status does not establish construction activity or completion.
Application date: 2022-08-23.
Permit issue date: 2022-09-15.
Source final date: 2023-04-18.
Source expiry date: 2024-09-15.
Addresses listed by the municipality: 238 FRANKLYN STREET. These are source-listed associations, not a verified parcel history.
Municipal application source
City of Nanaimo, What's Building public application CSV. The City is the data source, not necessarily the project owner. This profile is not managed or endorsed by the City.
Source data licence and terms of use

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

Feedback totals are unavailable.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.