Commercial / Multi / Industrial · BP126350
New construction of a 4 storey mixed use bldg. Floor 2 - 3.2.2.58 Group D, 823.13 m2 Commercial Office Space, Floors 3, 4 - 3.2.2.50 Group C, 1572.13 m2 Residential Apartment, 16 units, all over 3.2.2.83 Group F3, 1342 m2 parking garage. Total GFA 3743.3 m2. The Building is Sprinklered, with Fire Alarm System. Floor assemblies and load bearing walls require 1 hour FRR/ FS, STC 55 between suites & elevator, STC 50 suites & corridor. 1.5 FRR/FS between Parkade and CRU's. Alternative Solution for Exit Exposure Protection on lower floor CRU's, units 103, 104 & 202. REVISION: Sep 12/23 - Add fire separations (Unit 106/107) and move door for future TI REVISION: MAR 06/23- Relocation of oil interceptor REVISION: Feb. 14/23- Additional retaining wall added to the west side of the lot
Source: City of Nanaimo — Planning, building, demolition and subdivision records.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.