Project · Public

Commercial / Multi-Res Alteration — 303 - 1515 Dufferin Crescent, Nanaimo

Source: City of Nanaimo — Planning, building, demolition and subdivision records

Construction of Group D (Medical Office), 260 m2. Scope includes installing 2 H/C 2 pc washrooms, 2 sinks, 1 DW and 1 HWT. Addition/relocation of sprinkler heads Dec 29/21 - Revision Building reclassified under BP126872: (Colville Medical Center) Construction of 5 Storey, 3.2.2.24 (Group A), 3.2.2.62 (Group E), 3.2.2.56 (Group D) building with 5 Storey 3.2.2.80 (Group F3) parking garage. Building area 2020.5m2 Non-Combustible Construction, Sprinklered with Fire Alarm System. Building Code Description: First storey - Retail 3.2.2.62 (superimposed). 2nd -5th storey - Office 3.2.2.56. 2 Hr. FRR/FS required for floor assemblies/exits, between 1st and 2nd storey and loadbearing supports, 1 Hr. FRR/FS required for floor assemblies, exits and loadbearing support (above 2nd storey), 1.5 hr. FRR/FS required between Storage Garage and other occupancies. Exposed Bldg face requirements 2 hr. FRR West (Group E ),1 hr FRR South and East, 2 hr FRR for Garbage rm. east wall face.

Listed on FolioProjects
2026-11-13
Location
303 - 1515 Dufferin Crescent
Application number
BP127840
Source-reported status
COMPLETED
Application date
2021-09-10

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Municipal application details

Commercial / Multi-Res Alteration · BP127840

Construction of Group D (Medical Office), 260 m2. Scope includes installing 2 H/C 2 pc washrooms, 2 sinks, 1 DW and 1 HWT. Addition/relocation of sprinkler heads Dec 29/21 - Revision Building reclassified under BP126872: (Colville Medical Center) Construction of 5 Storey, 3.2.2.24 (Group A), 3.2.2.62 (Group E), 3.2.2.56 (Group D) building with 5 Storey 3.2.2.80 (Group F3) parking garage. Building area 2020.5m2 Non-Combustible Construction, Sprinklered with Fire Alarm System. Building Code Description: First storey - Retail 3.2.2.62 (superimposed). 2nd -5th storey - Office 3.2.2.56. 2 Hr. FRR/FS required for floor assemblies/exits, between 1st and 2nd storey and loadbearing supports, 1 Hr. FRR/FS required for floor assemblies, exits and loadbearing support (above 2nd storey), 1.5 hr. FRR/FS required between Storage Garage and other occupancies. Exposed Bldg face requirements 2 hr. FRR West (Group E ),1 hr FRR South and East, 2 hr FRR for Garbage rm. east wall face.

Application address
303 - 1515 Dufferin Crescent
Source-reported status
COMPLETED
Application submitted
Issued date
Source final date
Source expiry date

Other addresses listed in this application: 303 1515 DUFFERIN CRESCENT.

Source: City of Nanaimo — Planning, building, demolition and subdivision records.

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

About this project

Commercial / Multi-Res Alteration · BP127840
Construction of Group D (Medical Office), 260 m2. Scope includes installing 2 H/C 2 pc washrooms, 2 sinks, 1 DW and 1 HWT. Addition/relocation of sprinkler heads Dec 29/21 - Revision Building reclassified under BP126872: (Colville Medical Center) Construction of 5 Storey, 3.2.2.24 (Group A), 3.2.2.62 (Group E), 3.2.2.56 (Group D) building with 5 Storey 3.2.2.80 (Group F3) parking garage. Building area 2020.5m2 Non-Combustible Construction, Sprinklered with Fire Alarm System. Building Code Description: First storey - Retail 3.2.2.62 (superimposed). 2nd -5th storey - Office 3.2.2.56. 2 Hr. FRR/FS required for floor assemblies/exits, between 1st and 2nd storey and loadbearing supports, 1 Hr. FRR/FS required for floor assemblies, exits and loadbearing support (above 2nd storey), 1.5 hr. FRR/FS required between Storage Garage and other occupancies. Exposed Bldg face requirements 2 hr. FRR West (Group E ),1 hr FRR South and East, 2 hr FRR for Garbage rm. east wall face.
Source-reported status: COMPLETED. Application status does not establish construction activity or completion.
Application date: 2021-09-10.
Permit issue date: 2021-12-16.
Source final date: 2022-03-18.
Source expiry date: 2023-12-18.
Addresses listed by the municipality: 303 1515 DUFFERIN CRESCENT. These are source-listed associations, not a verified parcel history.
Municipal application source
City of Nanaimo, What's Building public application CSV. The City is the data source, not necessarily the project owner. This profile is not managed or endorsed by the City.
Source data licence and terms of use

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

Feedback totals are unavailable.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.