Commercial / Multi-Res Alteration · BP124966
Building renovation / fire order, unit 100, (empty commercial unit), Group E, retail occupancy, 179.7m2. Work on lower floor includes installing / repairing ceiling and supporting posts "Fire Separations" with a 1 hr. FRR, enlarge "universal" washroom, move wall, sink and door location, install interior partition walls, install access to "universal" washroom through wall identified as "exposed wall structure". Conformation from Technical Safety BC regarding review of electrical systems for entire bldg. Review of fire separation between the 2 residential suites required. Two-storey, Part 9, unsprinklered building. Lower level, 179.7m2 is existing retail Group "E" space and upper level is Group "C" (2 units) 269.2m2. 1 hour FRR/FS between floors existing. 45 min.vertical fire separation between residential suites. Jan 10/14 - Revision - upper floor gutted and new plumbing, electrical, heating, drywall, floor covering etc... throughout, Structural Engineer added to scope of work
Source: City of Nanaimo — Planning, building, demolition and subdivision records.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.