Project · Public

Commercial / Multi / Industrial — 2050 Latimer Rd (After School Care), Nanaimo

Source: City of Nanaimo — Planning, building, demolition and subdivision records

Forest Park Elementary School - New Bldg for After School Care #2, (Day Care) Building Classification 3.2.2.28, Group A2 Occupancy(201m2), sprinklered with fire alarm. walls between buildings built as a 1hr FRR/FS. Work includes new pier type foundations and site built stairs and ramps for access. Plumbing fixtures include 1 Accessible WC; 1 Universal WC; 2 additional toilets; 2 washbasins; 1 sink and 1 auto washer. BP126816 - for the other modular in the cluster. REVISION; SEP.13.2022- Layout change to M5

Listed on FolioProjects
2026-11-13
Location
2050 Latimer Rd (After School Care)
Application number
BP126815
Source-reported status
COMPLETED
Application date
2020-10-16

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Municipal application details

Commercial / Multi / Industrial · BP126815

Forest Park Elementary School - New Bldg for After School Care #2, (Day Care) Building Classification 3.2.2.28, Group A2 Occupancy(201m2), sprinklered with fire alarm. walls between buildings built as a 1hr FRR/FS. Work includes new pier type foundations and site built stairs and ramps for access. Plumbing fixtures include 1 Accessible WC; 1 Universal WC; 2 additional toilets; 2 washbasins; 1 sink and 1 auto washer. BP126816 - for the other modular in the cluster. REVISION; SEP.13.2022- Layout change to M5

Application address
2050 Latimer Rd (After School Care)
Source-reported status
COMPLETED
Application submitted
Issued date
Source final date
Source expiry date

Other addresses listed in this application: 2050 LATIMER ROAD.

Source: City of Nanaimo — Planning, building, demolition and subdivision records.

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

Applications sharing a municipal address

These applications share an address listed by the municipality. They remain separate records; this does not confirm that they are phases of one development.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

About this project

Commercial / Multi / Industrial · BP126815
Forest Park Elementary School - New Bldg for After School Care #2, (Day Care) Building Classification 3.2.2.28, Group A2 Occupancy(201m2), sprinklered with fire alarm. walls between buildings built as a 1hr FRR/FS. Work includes new pier type foundations and site built stairs and ramps for access. Plumbing fixtures include 1 Accessible WC; 1 Universal WC; 2 additional toilets; 2 washbasins; 1 sink and 1 auto washer. BP126816 - for the other modular in the cluster. REVISION; SEP.13.2022- Layout change to M5
Source-reported status: COMPLETED. Application status does not establish construction activity or completion.
Application date: 2020-10-16.
Permit issue date: 2021-11-12.
Source final date: 2022-10-27.
Source expiry date: 2023-11-12.
Addresses listed by the municipality: 2050 LATIMER ROAD. These are source-listed associations, not a verified parcel history.
Municipal application source
City of Nanaimo, What's Building public application CSV. The City is the data source, not necessarily the project owner. This profile is not managed or endorsed by the City.
Source data licence and terms of use
The municipality lists different civic and associated-property addresses. They are retained as source evidence, not verified parcel equivalence.

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

Feedback totals are unavailable.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.