Source: City of Nanaimo — Planning, building, demolition and subdivision records
New Correctional Centre - (Bldg GS) Construction of new Multipurpose Building - Building Classification: 2018 BCBC, 3.2.2.27 Group A2 occupancy, Bldg area 446m2, 2 storey,combustible or non-combustible construction, sprinklered to NFPA-13, 2 stage fire alarm system, no FRR required for floor assemblies or mezzanine. Alternative Solution for Exit Exposure Protection (Water Curtain) Key Fire Separation 2 Hr FRR/FS for electrical rooms 1 Hr FRR/FS provided for TR room. 728.50 GFA m2 2024-FEB-15 revision to add record drawings.
New Correctional Centre - (Bldg GS) Construction of new Multipurpose Building - Building Classification: 2018 BCBC, 3.2.2.27 Group A2 occupancy, Bldg area 446m2, 2 storey,combustible or non-combustible construction, sprinklered to NFPA-13, 2 stage fire alarm system, no FRR required for floor assemblies or mezzanine. Alternative Solution for Exit Exposure Protection (Water Curtain) Key Fire Separation 2 Hr FRR/FS for electrical rooms 1 Hr FRR/FS provided for TR room. 728.50 GFA m2 2024-FEB-15 revision to add record drawings.
Application address
3945 Biggs Road (BLDG GS)
Source-reported status
COMPLETED
Application submitted
Issued date
Source final date
Source expiry date
Source: City of Nanaimo — Planning, building, demolition and subdivision records.
These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.
Public Broadcast · screens & websites
Shows only publicly available records. Private records are excluded, even when you are signed in.
Commercial / Multi / Industrial · BP127955
New Correctional Centre - (Bldg GS) Construction of new Multipurpose Building - Building Classification: 2018 BCBC, 3.2.2.27 Group A2 occupancy, Bldg area 446m2, 2 storey,combustible or non-combustible construction, sprinklered to NFPA-13, 2 stage fire alarm system, no FRR required for floor assemblies or mezzanine. Alternative Solution for Exit Exposure Protection (Water Curtain) Key Fire Separation 2 Hr FRR/FS for electrical rooms 1 Hr FRR/FS provided for TR room. 728.50 GFA m2 2024-FEB-15 revision to add record drawings.
Source-reported status: COMPLETED. Application status does not establish construction activity or completion.
Application date: 2021-11-01.
Permit issue date: 2023-01-26.
Source final date: 2024-04-11.
Source expiry date: 2025-01-26.
Municipal application source
City of Nanaimo, What's Building public application CSV. The City is the data source, not necessarily the project owner. This profile is not managed or endorsed by the City.
Source data licence and terms of use
HueFlux feedback
Recorded project feedback. These responses do not establish property condition or represent the whole community.
Essential cookies keep FolioProjects working. With your permission, Mouseflow records visits to selected public marketing pages. Recording is disabled when you are signed in and on private pages.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.