Project · Public

Commercial / Multi-Res Alteration — 102 - 115 Chapel Street, Nanaimo

Source: City of Nanaimo — Planning, building, demolition and subdivision records

(Criss Cannabis) Unit 102: Change of Major Occupancy from Group A2 to Group E. Scope of work includes extending a partition wall to the underside of structure to achieve a continuous fire separation between the suites having a 1 HR FRR. Plumbing changes include the installation of 2 new hand sinks in the retail area. Building Area: 409m2. 1 hour FRR/FS between CRU's and fire alarm (pull stations at both front doors). Existing Building Classification (BP029777) NBC 1980 3.2.2.14/.29/.33: Group A2/D/E, 409m2 building area, 1-storey, facing one street, unsprinklered, combustible construction 45-min FRR or treated wood roof, 45-min FRR or NC loadbearing assemblies.

Listed on FolioProjects
2026-11-13
Location
102 - 115 Chapel Street
Application number
BP131687
Source-reported status
COMPLETED
Application date
2026-03-23

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Municipal application details

Commercial / Multi-Res Alteration · BP131687

(Criss Cannabis) Unit 102: Change of Major Occupancy from Group A2 to Group E. Scope of work includes extending a partition wall to the underside of structure to achieve a continuous fire separation between the suites having a 1 HR FRR. Plumbing changes include the installation of 2 new hand sinks in the retail area. Building Area: 409m2. 1 hour FRR/FS between CRU's and fire alarm (pull stations at both front doors). Existing Building Classification (BP029777) NBC 1980 3.2.2.14/.29/.33: Group A2/D/E, 409m2 building area, 1-storey, facing one street, unsprinklered, combustible construction 45-min FRR or treated wood roof, 45-min FRR or NC loadbearing assemblies.

Application address
102 - 115 Chapel Street
Source-reported status
COMPLETED
Application submitted
Issued date
Source final date
Source expiry date

Other addresses listed in this application: 115 CHAPEL STREET.

Source: City of Nanaimo — Planning, building, demolition and subdivision records.

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

Applications sharing a municipal address

These applications share an address listed by the municipality. They remain separate records; this does not confirm that they are phases of one development.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

About this project

Commercial / Multi-Res Alteration · BP131687
(Criss Cannabis) Unit 102: Change of Major Occupancy from Group A2 to Group E. Scope of work includes extending a partition wall to the underside of structure to achieve a continuous fire separation between the suites having a 1 HR FRR. Plumbing changes include the installation of 2 new hand sinks in the retail area. Building Area: 409m2. 1 hour FRR/FS between CRU's and fire alarm (pull stations at both front doors). Existing Building Classification (BP029777) NBC 1980 3.2.2.14/.29/.33: Group A2/D/E, 409m2 building area, 1-storey, facing one street, unsprinklered, combustible construction 45-min FRR or treated wood roof, 45-min FRR or NC loadbearing assemblies.
Source-reported status: COMPLETED. Application status does not establish construction activity or completion.
Application date: 2026-03-23.
Permit issue date: 2026-07-10.
Source final date: 2026-09-08.
Source expiry date: 2028-07-10.
Addresses listed by the municipality: 115 CHAPEL STREET. These are source-listed associations, not a verified parcel history.
Municipal application source
City of Nanaimo, What's Building public application CSV. The City is the data source, not necessarily the project owner. This profile is not managed or endorsed by the City.
Source data licence and terms of use

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

Feedback totals are unavailable.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.