Commercial / Multi-Res Alteration · BP129608
(RDN Office) Commercial Alteration: Interior office layout alterations in 3 locations. Area #1 - Lower/main floor: install partition wall systems 48.3m2. Area #2 - Upper/2nd floor: Remove interior partition walls/create open office 236.9m2. Area #3 - Upper/2nd floor: Create Asset Manager office 9,3m2. Sprinkler alterations in Area 1 & 2, relocate, delete and add heads for new layouts. Administration Bldg. Part 3, sprinklered , fire alarm, accessible, Group A-2 & D, 2 storey building. Building classification 2006 BCBC 3.2.2.26 & 3.2.2.54. New Building Area (BCBC) = 1221.6m2. GFA = 2309m2 Combustible construction, 45min FRR/FS floor assemblies and loadbearing supports. Interconnected floor space between upper and lower floor meets 3.2.8.2.(6). 2024-JUN-12 REVISION: Add structural beam and footings to office 110 and various layout changes. 2024-JUL-19 REVISION: Add Fire Suppression Engineer.
Other addresses listed in this application: 6300 HAMMOND BAY ROAD.
Source: City of Nanaimo — Planning, building, demolition and subdivision records.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.